Advice
Pool advice: construction, equipment and maintenance.
15 articles on plant rooms, construction and maintenance — written by people who do the work every day.

A pool in the garden: from decision to first swim
A pool measuring 8 × 4 × 1.5 m holds 48 m³; the first fill at the ViK Split tariff costs about €96, around 307 litres evaporate per day in summer, and a concrete shell takes 6–12 weeks to build. Everything you need to decide before excavation starts.
Read articleRobotic pool cleaner or pool vacuum: which to choose
A robot if you want the pool to clean itself, a battery vacuum if you clean now and then – in our range, from €335 to €2,200.

Pool pump: how to choose the right one (filter pump)
A pump is chosen by flow, not motor power: about 12 m³/h for 8 × 4 × 1.5 m – and the upper limit is set by the filter and the pipes.

Sand filter pump for a pool: sizing and installation
A monobloc of pump, filter and valve: flow (volume × 2) ÷ 8, how much sand goes into the D400–D750 and where the unit may be installed.

Sand vs quartz pool filter – which one filters better
‘Sand’ and ‘quartz’ filters are the same thing; the real choice is quartz sand (30–60 µm) or activated glass (down to 5 µm).

Pool systems and equipment: how to put together a plant room
The four essential parts of a plant room – pump, filter, multiport valve and disinfection – and what is added as needed.

Pool steps and ladders: types, standards and safety
The way into the pool is a safety feature: EN 13451-2 requires a step height of 230–300 mm and a ladder width of 450–600 mm.

Ceramics and tiles for pools: which to choose
Glass mosaic, porcelain ceramic or PVC liner – water absorption and slip resistance decide, not appearance.

Infinity and overflow pools: how they really work
Water level flush with the edge, a perimeter channel and a balance tank – and what that means for the plant room.

Bio pools: how they function, what they cost and whether they work in Dalmatia
A chlorine-free pool with a regeneration zone of at least 50% of the surface – what the regulation (NN 59/2020) requires and whether it makes sense in the south.

Concrete, fibreglass or overflow pool: what to choose in Dalmatia
Concrete, fibreglass or overflow pool? Prices, a comparison table, linings and what really decides in Dalmatia: site access and excavation in rock.

How much does it cost to build a pool? Prices by type and size (2026)
Pool construction cost 2026: a concrete 8×4 m pool from ≈€35,000 (excluding the concrete shell), prices by type and lining, equipment, maintenance and 10-year ownership cost. Real-world price ranges.
