{"id":5512,"date":"2026-08-03T12:50:14","date_gmt":"2026-08-03T11:50:14","guid":{"rendered":"https:\/\/flusso.hr\/?p=5512"},"modified":"2026-08-26T22:57:19","modified_gmt":"2026-08-26T21:57:19","slug":"izgradnja-bazena-cijena","status":"publish","type":"post","link":"https:\/\/flusso.hr\/en\/izgradnja-bazena-cijena\/","title":{"rendered":"How much does it cost to build a swimming pool? Prices by type and size (2026)"},"content":{"rendered":"

The construction of an 8 x 4 concrete pool is the guiding principle of our design 35,000 euros<\/strong>, and the realistic minimum budget for the entire pool project is 50,000 euros<\/strong>. An overflow version of the same size is about 30 % more expensive. The range is wide because the pool is calculated per project, not per square meter. All figures below are indicative ranges, not a binding offer.<\/p>\n

You don't buy a pool once \u2014 you pay for it for ten years: maintenance, electricity, engine room service and, depending on the liner, one liner replacement within that period. That's why you'll find the table below cost of ownership over 10 years<\/strong> and an explanation of why a \u201cper square\u201d comparison almost certainly leads you in the wrong direction. If you\u2019re just putting together the big picture of a project, start with our a complete guide to building a swimming pool in Croatia<\/a>.<\/p>\n

How much does a swimming pool cost per type?<\/h2>\n

An 8 \u00d7 4 m concrete pool in our country costs approximately \u20ac35,000, while an overflow version of the same size costs around \u20ac30 more, i.e. around \u20ac45,500. Publicly published market ranges from other sources range from \u20ac1,000 for a prefabricated metal pool to almost \u20ac60,000 for a concrete pool with ceramics. This difference is not a mess on the market \u2014 these are different products with different lifespans.<\/p>\n

The table clearly separates what is our data<\/strong> (Flusso, concrete construction, July 2026) from market range<\/strong> taken from publicly published price lists of other sources.<\/p>\n\n\n\n\n\n\n\n\n\n
Pool type<\/th>\nFlusso (orientation)<\/th>\nMarket range (public sources)<\/th>\nSource of market range<\/th>\n<\/tr>\n<\/thead>\n
Concrete skimmer 8 \u00d7 4 m<\/strong><\/td>\n\u2248 \u20ac35,000<\/strong><\/td>\n\u20ac25,000\u201358,800 (concrete, general)
900\u20131,250 \u20ac\/m\u00b2<\/td>\n
Trebam.hr<\/a>, eMajstor.hr<\/a><\/td>\n<\/tr>\n
Concrete overflow \/ infinity 8 \u00d7 4 m<\/strong><\/td>\n\u2248 30 % more expensive than skimmer<\/strong> (\u2248 \u20ac45,500)<\/td>\nnot separately published<\/td>\n\u2014<\/td>\n<\/tr>\n
Polyester (recessed shell)<\/strong><\/td>\nwe do not carry out \u2014 we build exclusively concrete<\/td>\n\u20ac13,800\u201320,000 built-in
780\u20131,080 \u20ac\/m\u00b2 with excavation<\/td>\n
Trebam.hr<\/a>, eMajstor.hr<\/a><\/td>\n<\/tr>\n
Prefabricated (metal \/ wood \/ composite)<\/strong><\/td>\nwe do not perform<\/td>\nmetal \u20ac1,000\u20131,800
wooden \u20ac5,000\u20138,400
composite \u20ac6,800\u201310,900
inflatable \u20ac100\u2013680<\/td>\n
Trebam.hr<\/a><\/td>\n<\/tr>\n
Concrete 8 \u00d7 4 \u00d7 1.5 m per treatment<\/strong><\/td>\nsee the section on the cover below<\/td>\nPVC foil \u20ac23,000\u201342,000
ceramics \/ mosaic \u20ac32,000\u201360,000<\/td>\n
bazenirijeka.com<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

Our \u20ac35,000 is in the lower half of the market range because that is the price our scope<\/strong> \u2014 reinforced concrete shells, pool techniques and cladding, not a finished yard with a terrace, lighting and fence.<\/p>\n

\n

Key:<\/strong> \u20ac35,000 and \u20ac50,000 are not contradictory figures. The first is the price of a pool like the one we build. The second is the budget for the entire project \u2014 everything around the pool that isn't the pool. If you only plan for the first, your project will "grow" towards the end.<\/p>\n<\/div>\n

\n\"Chart:
Price range by pool type \u2014 Flusso compared to publicly published market ranges.<\/figcaption><\/figure>\n

Why is the price per m\u00b2 misleading?<\/h2>\n

The price per square meter assumes that a pool with half the area is half the price. It is not. The engine room, excavation, connections, waterproofing and project documentation are largely fixed costs<\/strong> \u2014 they exist regardless of whether you are building 18 or 32 m\u00b2. That's why we calculate by project, not by square meter.<\/p>\n

Let's show this with arithmetic. Our 8 \u00d7 4 m pool has a floor area of 32 m\u00b2 and an approximate price of \u20ac35,000, which comes out to around \u20ac1,094\/m\u00b2<\/strong> \u2014 neatly within the market range of 900 to 1,250 \u20ac\/m\u00b2 published by eMajstor.hr<\/a>. But notice the width of that range: \u20ac900 and \u20ac1,250 differ by almost 39 %. On 32 m\u00b2, that's a difference of \u20ac11,200. The number that has 39 % spread is not the price \u2014 it's the orientation.<\/p>\n

The second trap is that the square knows nothing about depth, and equipment is dimensioned by cubic meters of water<\/strong>. The volume determines which filter and pump go into the engine room: (elaboration in the guide on swimming pool technology and equipment<\/a>)<\/p>\n